Beverly Man
| Train Frequency: | Daily |
| Train Consist: | 1-2 Tank Cars
3 Box Cars 1-2 Empty pulpwood cars |
| Train Assignment: | Run to Beverly, exchange empties for loads at Tygart Pulp and Paper and Bevco Chemical and return to SlatyFork. |
Burdette Creek Shifter
| Train Frequency: | As needed |
| Train Consist: | Empty coal cars as needed
Empty wood chip cars as needed Empty box cars as needed |
| Train Assignment: | Run to Burdette Creek, exchange
empties for loads at Coleman Coal and Coke and Greenbrier Lumber Company,
and return to SlatyFork.
Note: May be combined with Couch Turnaround. |
Couch Turnaround (aka Couch Potato)
| Train Frequency: | Daily |
| Train Consist: | 2 Covered Hoppers
3 Box Cars 2 Gondola Cars If run with Burdette Creek Shifter: Empty Pulp Wood Cars as needed Empty Box Cars as needed Empty Coal Cars if needed |
| Train Assignment: | Run to Couch, switch Couch Industrial Park and return. If combined with Burdette Creek Shifter, switch Coleman Coal and Coke enroute to Couch and switch Greenbrier Lumber Company when returning from Couch. |
Trivett Shifter
| Train Frequency: | Daily |
| Train Consist | 20 Empty Coal Cars |
| Assignment: | Run to Couch, exchange empties for load at Trivett Coal and return to SlatyFork. |
Corley Shifter
| Train Frequency: | Daily |
| Train Consist: | 25 Empty Coal Cars |
| Train Assignment: | Run to Weaver Creek, exchange empties for loads at Corley Coal. Return to SlatyFork. At discretion of dispatcher and yardmaster, Corley Shifter may also deliver loads directly to Brown Power. |
Summit Shifter
| Train Frequency: | As needed |
| Train Consist: | Empty Coal Cars as needed. |
| Assignment: | Run to Smith Summir, exchange empties for loads at Cheat River Mining. Take any empties spotted at Old Main Spur and deliver to Cheat River Mining. Return to Slaty Fork. |
| Train Frequency: | Daily |
| Train Consist: | General Merchandise cars that are for Eastern Roads. |
| Assignment: | Train should depart southbound from SlatyFork no later than 11:30 pm. |
| Train Frequency: | Daily |
| Train Consist: | General Merchandise for Southern Ohio. |
| Assignment: | Train is a continuation of CV96 and departs southbound after any switch work at SlatyFork. |
| Train Frequency: | Daily |
| Train Consist: | Merchandise for Western Railroads. |
| Assignment: | Train should depart SlatyFork northbound no later than 10:30 pm. |
| Train Frequency: | As needed |
| Train Consist: | Any type of car. |
| Assignment: | Train runs northbound from SlatyFork with cars that are not time sensitive or cars that are deemed surplus by the SlatyFork yardmaster. Train may make switching moves enroute. |
| Train Frequency: | As needed |
| Train Consist: | Any type of car. |
| Assignment: | Runs northbound with cars that are not time sensitive or considered surplus. Train may make set outs at industries. Train becomes B&O351 at SlatyFork. |
SlatyFork 91
| Train Frequency: | Daily |
| Train Consist: | General Merchandise cars for Western Roads. |
| Assignment: | Departs Elkton northbound by 9:00 pm. Becomes CV97 at SlatyFork. |
| Train Frequency: | Daily |
| Train Consist: | Intermodal and auto racks.. |
| Assignment: | Runs northbound from Elkton to North Yard. Stops at SlatyFork for locomotive and bad order pickups or setouts. |
| Train Frequency: | As needed |
| Train Consist: | Southern Ohio Black Diamond Grain Service cars. |
| Assignment: | Runs northbound from Elkton to North Yard. Stops at SlatyFork for helpers and to make locomotive and bad order set outs and pickups. Train is dedicated for Souther Ohio Black Diamond Grain Service cars. |
CV 96
| Train Frequency: | Daily |
| Train Consist: | Cars destined for SlatyFork or for the Southern Ohio. |
| Assignment: | Train runs southbound to SlatyFork. |
| Train Frequency: | Daily |
| Train Consist: | General Merchandise for Eastern Roads. |
| Assignment: | Runs south to SlatyFork. Reclassified as H94 at SlatyFork. |
| Train Frequency: | Daily |
| Train Consist: | Intermodal and auto racks. |
| Assignment: | Runs southbound to Elkton. Stops at SlatyFork for locomotive and bad order set outs and pickups only. |
| Train Frequency: | As needed |
| Train Consist: | Two locomotives, preferrably six axle.. |
| Assignment: | Assist trains from SlatyFork to Pipe Falls as required by timetable. |
| Train Frequency: | As needed |
| Train Consist: | Two locomotives, preferrably six axle. |
| Assignment: | Assist trains from Beverly to Smith Summit as required by timetable. |